build(deps): lock file maintenance (main)
Metadata
Current evaluation
Renovate's weekly lock file maintenance PR for craft-application was rebased by @lengau onto main and merged as commit 1a6e59f3, refreshing all dependency locks (+324/-299 across 2 files) after two approvals and fully green CI.
Resolution: closed resolved
Reason: The PR itself is the resolution: it was approved by 2 reviewers, all CI checks passed, and it was merged into main as commit 1a6e59f3 ("build(deps): lock file maintenance (main) (#788)"), confirmed in the repository history.
Evaluated by: mr-cal-bot
No scores available.
Issue body
This PR contains the following updates:
| Update | Change |
|---|---|
| lockFileMaintenance | All locks refreshed |
🔧 This Pull Request updates lock files to use the latest dependency versions.
---
### Configuration
📅 **Schedule**: Branch creation - "before 4am on monday" in timezone Etc/UTC, Automerge - At any time (no schedule defined).
🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.
♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.
👻 **Immortal**: This PR will be recreated if closed unmerged. Get [config help](https://redirect.github.com/renovatebot/renovate/discussions) if that's undesired.
---
- [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box
---
This PR was generated by [Mend Renovate](https://mend.io/renovate/). View the [repository job log](https://developer.mend.io/github/canonical/craft-application).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0MC41MC4wIiwidXBkYXRlZEluVmVyIjoiNDAuNTAuMCIsInRhcmdldEJyYW5jaCI6Im1haW4iLCJsYWJlbHMiOlsiZGVwZW5kZW5jaWVzIl19-->
Evaluation history
| Date | Model | Scores | Action | Summary |
|---|---|---|---|---|
| stealth/space-bunny-alpha | — | closed resolved | Renovate's weekly lock file maintenance PR for craft-application was rebased by @lengau onto main and merged as commit 1a6e59f3, refreshing all dependency locks (+324/-299 across 2 files) after two approvals and fully green CI. | |
| stealth/space-bunny-alpha | — | closed resolved | Merged as 1a6e59f3 via PR #788, rebasing the Renovate-generated lock-file maintenance branch onto main after two approvals and all CI checks passed. | |
| qwen/qwen3.6-35b-a3b | — | — | Merged following two approvals and passing CI checks. The Renovate bot refreshed dependency lock files on main. With automerge disabled, maintainers manually merged the rebased branch. |
Update history
No update history recorded yet.
Related work
-
Related To:
canonical/craft-application#950
(confidence 80%)
Later recurring Renovate lock file maintenance PR (commit 40995ca2) continuing the same weekly dependency-refresh series in this repo.
Related issues
| Issue | Project | State | Summary | Similarity |
|---|---|---|---|---|
| #3 build(deps): lock file maintenance | debcraft | merged | Renovate's weekly "build(deps): lock file maintenance" PR was approved and merged into main as commit 213a031, refreshing all lock files (+15/-15 in1 file) with all CI checks passing. | |
| #113 build(deps): lock file maintenance | craft-grammar | merged | Renovate's lockFileMaintenance PR refreshing all locks was merged into main as commit 8a54b76 (1 file, +891/-694), after 2 approvals and a fully green CI run. | |
| #126 build(deps): lock file maintenance (main) | starflow | merged | Renovate lock file maintenance PR merged into main as commit 7486dc7, refreshing all dependency locks (+431/-352 in one lock file) with 2 approvals and all CI checks passing. | |
| #123 build(deps): lock file maintenance (main) | starflow | merged | Renovate PR #123 was merged, refreshing all dependency lock files in commit 7927b84 after two approvals and with all CI checks passing. | |
| #121 build(deps): lock file maintenance (main) | starflow | merged | Renovate lock file maintenance PR was merged into main via commit 51ffcc2 ("build(deps): lock file maintenance (#121)"), refreshing dependency locks; 2 approvals, all CI green. | |
| #250 build(deps): lock file maintenance (main) | craft-archives | merged | PR #250 merged into main, refreshing all dependency lock files with Renovate after approval and a fully passing CI run. | |
| #206 build(deps): lock file maintenance (main) | craft-grammar | merged | Renovate PR #206 was approved and merged into main, refreshing all dependency lock files; all CI checks passed. | |
| #223 build(deps): lock file maintenance (main) | craft-archives | merged | Renovate lock file maintenance PR merged into main (commit 227399e), refreshing all dependency locks; approved with all CI checks passing. | |
| #431 build(deps): lock file maintenance | starbase | merged | Renovate lock file maintenance PR #431 was merged into main as commit e2c955d, refreshing all dependency lock files; approved by 2 reviewers with all CI checks passing. | |
| #137 build(deps): lock file maintenance (main) | starflow | merged | Renovate lock file maintenance PR merged into main via commit a1a4e0d, refreshing dependency locks (+244/-230 in one file). All CI checks passed and it was approved by 2 reviewers. |