← Back to issue list

chore(merge): update starbase (2026-07-14)

View original Github issue

Metadata

Project
craft-archives
Number
#236
Type
pull request
State
closed
Author
lengau
Labels
PR: Merge
Created
Updated
Closed

Current evaluation

Closed unmerged; the Starbase update was later merged through #252 in commit 1b56643.

Resolution: closed superseded

Reason: PR #236 was abandoned with OSV-scanner failing and 52 unresolved review comments. A later equivalent Starbase sync, #252, merged successfully with passing CI in commit 1b56643.

Evaluated by: mr-cal-bot

No scores available.

Issue body

Update common.mk and related shared Starcraft build/CI conventions by merging starbase/main.

Evaluation history

Date Model Scores Action Summary
stealth/space-bunny-alpha — closed superseded Closed unmerged; the Starbase update was later merged through #252 in commit 1b56643.
stealth/space-bunny-alpha — closed stale Closed unmerged with OSV-scanner failing and 52 unresolved review comments. The July 14 Starbase sync was abandoned; a separate #235 updated the scanner.
stealth/space-bunny-alpha — closed stale The Starbase maintenance PR updated common.mk and shared build/CI conventions but was closed unmerged, with OSV-scanner failing and 52 review comments unresolved.
qwen/qwen3.6-35b-a3b — — Closed without merging due to a failing OSV-scanner check and 52 unresolved review comments. The routine maintenance PR intended to sync build conventions from starbase/main was abandoned.
qwen3.6-35b-a3b-mtp-q6 — — Merged routine update to common.mk and shared Starcraft build/CI conventions by syncing with starbase/main. Closed without comments or requested changes.

Update history

No update history recorded yet.

Related work

  • Superseded By: canonical/craft-archives#252 (confidence 98%)

    A later Starbase-to-main merge completed the intended update successfully.

  • Related To: canonical/craft-archives#235 (confidence 95%)

    Merged in 32fca2c and updated the OSV scanner to match Starbase, addressing the reported CI failure.

Related issues

Issue Project State Summary Similarity
#238 chore(merge): update starbase (2026-07-16) craft-archives closed PR #238 was closed unmerged after an external linkcheck timeout; its Starbase sync was later merged through replacement PR #252.
93%
#236 chore(merge): update starbase (2026-06-18) craft-platforms closed Starbase sync PR #236 was closed unmerged; rebuilt replacement #270 later merged Starbase into main as commit 4afcee7.
92%
#2895 chore(merge): update starbase (2026-09-24) charmcraft closed Draft Starbase sync PR #2895 (2026-09-24) was closed unmerged; the same update was reworked as #2899 (2026-09-28), which merged as commit 8da01822 after prep PRs #2897/#2898.
90%
#237 chore(merge): update starbase (2026-07-14) craft-archives closed PR #237 was closed unmerged after failing CI checks and leaving 29 review comments unresolved; no resolving commit was identified.
88%
#449 chore(merge): update starbase (2026-09-28) imagecraft merged Merged in #449 via commit 545f51a, rebuilding the Starbase sync on current main and starbase/main and folding dependency, lint, docs, and CI adjustments into one merge.
87%
#177 chore(merge): update starbase (2026-07-22) debcraft closed Starbase merge PR #177 was closed unmerged because OSV-scanner failed; the maintainer confirmed main had the same issue and deferred a fresh merge PR.
87%
#728 chore: switch to starbase craft-providers closed Closed unmerged after review remained pending; the Starbase migration was later completed by #786/#787, with #787 merged as commit 808597b.
86%
#493 chore(merge): update starbase (2026-10-08) craft-cli closed Merged routine starbase/main sync updating build system, CI workflows, documentation tooling, and dependencies, with resolved merge conflicts.
86%
#30 chore: merge starbase craft-grammar closed Closed unmerged; the starbase integration landed on main via commit 3a6f6c4 (chore(merge): 'starbase' into 'main').
86%
#507 chore(merge): update starbase (2026-10-20) craft-cli merged Merged starbase/main sync updating CI workflows, build tooling, and docs scaffolding. Resolved 27 file conflicts, incorporated prep PRs #505 and #506, and squashed follow-up fixes into a single merge commit.
86%