← Back to issue list

docs(changelog): finalize 2.11.0

View original Github issue

Metadata

Project
craft-parts
Number
#1111
Type
pull request
State
merged
Author
mr-cal
Labels
PR: Squash
Created
Updated
Closed

Current evaluation

Merged PR #1111 as commit f1677a8b, finalizing the 2.11.0 changelog with release features and documentation notes. All CI checks passed.

Resolution: closed resolved

Reason: PR #1111 was squash-merged as f1677a8b after two approvals, with all reported CI checks passing. The finalized changelog documents the 2.11.0 release dated 2025-06-04.

Evaluated by: mr-cal-bot

No scores available.

Issue body

- [x] Have you signed the [CLA](http://www.ubuntu.com/legal/contributors/)? - [x] Have you added an entry to the changelog (`docs/reference/changelog.rst`)? ----- Add an entry for the 2.11.0 release.

Evaluation history

Date Model Scores Action Summary
stealth/space-bunny-alpha — closed resolved Merged PR #1111 as commit f1677a8b, finalizing the 2.11.0 changelog with release features and documentation notes. All CI checks passed.
stealth/space-bunny-alpha — closed resolved Squash-merged PR #1111, adding the craft-parts 2.11.0 release entry to docs/reference/changelog.rst. It received two approvals and passed all CI checks.
qwen/qwen3.6-35b-a3b — — Squash merged after adding the changelog entry for release 2.11.0. Approved by two reviewers, passed all CI checks, and updated one file with 19 additions and one deletion.
qwen3.6-35b-a3b-mtp-q6 — — Merged and squashed into the main branch. Adds the official 2.11.0 release entry to the changelog, finalizing documentation for the version.

Update history

No update history recorded yet.

Related issues

Issue Project State Summary Similarity
#1085 docs(changelog): finalize 2.9.0 craft-parts merged Merged PR #1085 (commit 5e33d36b), consolidating unreleased changes from versions 2.8.1, 2.9.0, and 2.10.0 into the 2.9.0 changelog.
78%
#726 docs(changelog): finalize 2.1.1 craft-providers merged Merged #726 (453457e) finalized the 2.1.1 changelog; release branch 2.1.1 was then merged into main by #727 (e503d7c).
78%
#1198 docs: finalize 2.20.0 craft-parts merged Merged commit b968b66a finalized the 2.20.0 changelog after approval; all reported CI checks passed.
75%
#900 docs: finalize changelog for 5.10.0 craft-application merged Merged docs PR #900 (commit 33addfcd) finalizing the 5.10.0 changelog entry in docs/reference/changelog.rst, prepping the release; approved by 2 reviewers with all CI checks green.
74%
#1006 docs(changelog): finalize changelog for 2.6.0 craft-parts merged PR #1006 merged as commit f0c053c0 ("docs(changelog): finalize changelog for 2.6.0"), a one-line docs tweak to the CHANGELOG after two approvals.
74%
#932 docs(changelog): Release 5.11.0 craft-application merged Merged PR #932 added the 5.11.0 release entry to docs/reference/changelog.rst via commit fa41a461; all CI checks passed.
74%
#1549 docs(changelog): finalize 2.33.0 craft-parts merged Merged as f5932978, finalizing the 2.33.0 changelog and recording the organize-from-build revert delivered by #1548.
73%
#1128 docs: finalize changelog for 2.13.0 craft-parts merged Merged PR #1128 as commit 720df8d0, finalizing the Craft Parts 2.13.0 changelog ahead of release; review was approved and all reported CI checks passed.
73%
#322 docs: finalize changelog for 2.14.0 craft-cli merged Merged PR #322 via commit 177f96b, finalizing the craft-cli 2.14.0 changelog with a one-line documentation update.
72%
#363 docs: finalize 3.1.0 craft-cli merged Merged PR #363 as commit a5725db, finalizing the 3.1.0 changelog dated 2025-07-17 with feature, bug-fix (#334), and deprecation notes.
72%