← Back to issue list

build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.8

View original Github issue

Metadata

Project
imagecraft
Number
#144
Type
pull request
State
merged
Author
renovate[bot]
Labels
—
Created
Updated
Closed

Current evaluation

Renovate PR merged as commit 9503d58, bumping the astral-sh/ruff-pre-commit hook from v0.11.7 to v0.11.8 in .pre-commit-config.yaml. All CI checks passed; hook has since advanced to v0.16.9.

Resolution: closed resolved

Reason: The PR itself was merged into main via commit 9503d58, a one-line rev bump in .pre-commit-config.yaml with all checks green and2 approvals. The v0.11.8 pin was later superseded by subsequent Renovate bumps up to v0.16.9.

Evaluated by: mr-cal-bot

No scores available.

Issue body

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [astral-sh/ruff-pre-commit](https://redirect.github.com/astral-sh/ruff-pre-commit) | repository | patch | `v0.11.7` -> `v0.11.8` | Note: The `pre-commit` manager in Renovate is not supported by the `pre-commit` maintainers or community. Please do not report any problems there, instead [create a Discussion in the Renovate repository](https://redirect.github.com/renovatebot/renovate/discussions/new) if you have any questions. --- ### Release Notes <details> <summary>astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)</summary> ### [`v0.11.8`](https://redirect.github.com/astral-sh/ruff-pre-commit/releases/tag/v0.11.8) [Compare Source](https://redirect.github.com/astral-sh/ruff-pre-commit/compare/v0.11.7...v0.11.8) See: https://github.com/astral-sh/ruff/releases/tag/0.11.8 </details> --- ### Configuration 📅 **Schedule**: Branch creation - "every weekend" in timezone Etc/UTC, Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR was generated by [Mend Renovate](https://mend.io/renovate/). View the [repository job log](https://developer.mend.io/github/canonical/imagecraft). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOS4yNjQuMCIsInVwZGF0ZWRJblZlciI6IjM5LjI2NC4wIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJkZXBlbmRlbmNpZXMiXX0=-->

Evaluation history

Date Model Scores Action Summary
stealth/space-bunny-alpha — closed resolved Renovate PR merged as commit 9503d58, bumping the astral-sh/ruff-pre-commit hook from v0.11.7 to v0.11.8 in .pre-commit-config.yaml. All CI checks passed; hook has since advanced to v0.16.9.
stealth/space-bunny-alpha — closed resolved Renovate PR #144 bumped the ruff-pre-commit hook from v0.11.7 to v0.11.8 in .pre-commit-config.yaml. Approved by 2 reviewers, all CI checks green, and merged into main via commit 9503d58.
stealth/space-bunny-alpha — closed resolved Merged PR #144, updating the Ruff pre-commit hook from v0.11.7 to v0.11.8 in commit 9503d58; all checks passed.
qwen/qwen3.6-35b-a3b — — Merged an automated dependency update upgrading the astral-sh/ruff-pre-commit hook from v0.11.7 to v0.11.8. The change passed all CI checks and was automatically merged.
qwen3.6-35b-a3b-mtp-q6 — — Merged automated dependency update via Renovate bot. Updated astral-sh/ruff-pre-commit from v0.11.7 to v0.11.8. Automerge was enabled, applying the patch directly to the main branch without manual review.

Update history

No update history recorded yet.

Related work

  • Superseded By: imagecraft#454 (confidence 60%)

    Later Renovate PR raising the same ruff-pre-commit hook to v0.16.9 (commit eab877f), making the v0.11.8 pin obsolete.

Related issues

Issue Project State Summary Similarity
#394 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.12 starbase merged Renovate PR #394 merged to main as commit 5236f2a, bumping the astral-sh/ruff-pre-commit hook from v0.11.11 to v0.11.12 in .pre-commit-config.yaml. All CI checks passed; later hook bumps followed (e.g. #412, #580).
98%
#120 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.2 imagecraft merged Renovate PR merged (commit b885db6), bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.9.10 to v0.11.2; hook has since been updated further to v0.16.9.
98%
#434 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.11 starbase merged Renovate PR merged: bumped the astral-sh/ruff-pre-commit pre-commit hook in .pre-commit-config.yaml from v0.12.9 to v0.12.11 in commit cd7c68c, all CI checks passing.
98%
#390 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.11 starbase merged Renovate PR merged into main as commit b532d9a, bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.11.6 to v0.11.11 (+1/-1 line); all CI checks passed and it was approved by 2 reviewers.
98%
#139 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.7 imagecraft merged Renovate PR #139 merged (commit 2be8c57), bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.11.6 to v0.11.7 (+1/-1).
98%
#129 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.7 craft-platforms merged Renovate PR #129 bumping the astral-sh/ruff-pre-commit hook from v0.11.6 to v0.11.7 was merged into main as commit 8b06291 (one-line .pre-commit-config.yaml change).
97%
#150 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.11 imagecraft merged Merged PR #150 upgraded astral-sh/ruff-pre-commit from v0.11.10 to v0.11.11 in commit cf2e5ea, with all CI checks passing.
97%
#373 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.5 starbase merged Renovate PR #373 merged into main as commit 50ab73e, bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.9.9 to v0.11.5; later superseded by #379 (v0.11.6) and further updates.
97%
#884 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.11 (main) craft-application merged Renovate PR merged into main via commit 476d4714, bumping the astral-sh/ruff-pre-commit pre-commit hook from v0.12.10 to v0.12.11 in .pre-commit-config.yaml; all CI checks passed.
97%
#163 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.9 craft-platforms merged Renovate PR updating the astral-sh/ruff-pre-commit hook from v0.12.8 to v0.12.9 in .pre-commit-config.yaml was approved and merged as commit 156c757, with all CI checks passing.
97%