← Back to issue list

build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.6 (main)

View original Github issue

Metadata

Project
imagecraft
Number
#435
Type
pull request
State
merged
Author
renovate[bot]
Labels
PR: Dependencies
Created
Updated
Closed

Current evaluation

Renovate PR #435 bumped the astral-sh/ruff-pre-commit hook from v0.16.5 to v0.16.6 in .pre-commit-config.yaml. Approved (1 reviewer) and merged into main via automerge; +1/-1 line, no unresolved comments.

Resolution: closed resolved

Reason: PR #435 was merged into main after approval, applying the one-line .pre-commit-config.yaml version bump. Repo file/commit lookups were unavailable (no pinned SHA for imagecraft), so confirmation rests on the merged state and the issue record.

Evaluated by: mr-cal-bot

No scores available.

Issue body

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [astral-sh/ruff-pre-commit](https://redirect.github.com/astral-sh/ruff-pre-commit) | repository | patch | `v0.16.5` → `v0.16.6` | Note: The `pre-commit` manager in Renovate is not supported by the `pre-commit` maintainers or community. Please do not report any problems there, instead [create a Discussion in the Renovate repository](https://redirect.github.com/renovatebot/renovate/discussions/new) if you have any questions. --- ### Release Notes <details> <summary>astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)</summary> ### [`v0.16.6`](https://redirect.github.com/astral-sh/ruff-pre-commit/compare/v0.16.5...v0.16.6) [Compare Source](https://redirect.github.com/astral-sh/ruff-pre-commit/compare/v0.16.5...v0.16.6) </details> --- ### Configuration 📅 **Schedule**: (in timezone Etc/UTC) - Branch creation - "every weekend" - Automerge - At any time (no schedule defined) 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR was generated by [Mend Renovate](https://mend.io/renovate/). View the [repository job log](https://developer.mend.io/github/canonical/imagecraft). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0NC42MS4zIiwidXBkYXRlZEluVmVyIjoiNDQuNjkuMSIsInRhcmdldEJyYW5jaCI6Im1haW4iLCJsYWJlbHMiOlsiUFI6IERlcGVuZGVuY2llcyJdfQ==-->

Evaluation history

Date Model Scores Action Summary
stealth/space-bunny-alpha — closed resolved Renovate PR #435 bumped the astral-sh/ruff-pre-commit hook from v0.16.5 to v0.16.6 in .pre-commit-config.yaml. Approved (1 reviewer) and merged into main via automerge; +1/-1 line, no unresolved comments.
stealth/space-bunny-alpha — closed resolved Renovate PR bumping the astral-sh/ruff-pre-commit hook from v0.16.5 to v0.16.6 in .pre-commit-config.yaml was approved (1 reviewer) and merged into main; repo source lookup unavailable to pin the commit SHA.
stealth/space-bunny-alpha — closed resolved Renovate updated the Ruff pre-commit hook from v0.16.5 to v0.16.6. PR was approved and merged into main after CI completed.
qwen/qwen3.6-35b-a3b — — Merged an automated dependency update generated by Renovate. The astral-sh/ruff-pre-commit hook was upgraded from v0.16.5 to v0.16.6. Approved by a reviewer and auto-merged into main after passing CI checks.
qwen/qwen3.6-35b-a3b
Impact: 20
Quick Win: 20
Staleness: 0
Complexity: 0
Confidence: 75
keep open Routine dependency update from v0.16.5 to v0.16.6 for ruff-pre-commit hook. Generated by Renovate with automerge enabled. CI shows some failing tests (build, spread).
qwen/qwen3.6-35b-a3b
Impact: 25
Quick Win: 24
Staleness: 5
Complexity: 5
Confidence: 75
needs review Renovate PR updating pre-commit hook from v0.16.5 to v0.16.6. 1-day old, automerge enabled, trivial +1/-1 change. Some CI tests failing (build, spread boot tests).
qwen3.6-35b-a3b-mtp-q6
Impact: 10
Quick Win: 10
Staleness: 5
Complexity: 5
Confidence: 80
needs review Renovate PR updating astral-sh/ruff-pre-commit from v0.16.5 to v0.16.6. Fresh PR with automerge enabled. CI shows one failing check (build) and two pending snap-builds.

Update history

Date Change
updated
updated
updated
created

Related work

  • Related To: craft-store#423 (confidence 55%)

    Identical Renovate bump of astral-sh/ruff-pre-commit v0.16.5→v0.16.6 merged in craft-store as commit 5e27906

  • Related To: starbase#242 (confidence 35%)

    Upstream enabling of Renovate pre-commit manager support that produces these hook update PRs

Related issues

Issue Project State Summary Similarity
#420 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.3 (main) imagecraft merged Renovate PR #420 bumping the astral-sh/ruff-pre-commit pre-commit hook from v0.16.2 to v0.16.3 was approved (2 reviewers) and merged into main as commit 1c95077, a one-line .pre-commit-config.yaml change.
98%
#248 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.3 (main) craft-archives merged Renovate PR #248 bumped the astral-sh/ruff-pre-commit hook from v0.16.2 to v0.16.3; approved and merged into main as commit 575c0e9 (1-line change in .pre-commit-config.yaml).
98%
#183 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.3 (main) debcraft merged Renovate PR merged into main, bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.16.2 to v0.16.3 (1-line change, approved, all CI checks green).
98%
#480 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.5 (main) craft-cli merged Renovate dependency PR merged into main: bumped the ruff-pre-commit hook from v0.16.4 to v0.16.5 in .pre-commit-config.yaml (+1/-1 line). Approved by one reviewer, all CI checks passed.
98%
#265 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.5 (main) craft-platforms merged Renovate PR merged into main (approved, all CI green), bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.16.4 to v0.16.5 (+1/-1). Later superseded by #267, #269 and #278.
97%
#420 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.4 (main) craft-store merged Renovate PR merged into main, bumping the astral-sh/ruff-pre-commit pre-commit hook from v0.16.3 to v0.16.4 in .pre-commit-config.yaml (commit a01b21e, +1/-1).
97%
#1657 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.1 (main) craft-parts merged Renovate PR #1657 merged into main (commit dc5a3a74), bumping the ruff-pre-commit hook in .pre-commit-config.yaml from v0.15.22 to v0.16.1 (1-line change, 1 approval).
97%
#205 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.2 (main) craft-grammar merged Renovate PR merged into main as commit 71f4a1e, bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.16.1 to v0.16.2 (1-line diff, all CI green).
97%
#580 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.1 (main) starbase merged Renovate PR merged into main, bumping the ruff-pre-commit pre-commit hook from v0.15.21 to v0.16.1 in .pre-commit-config.yaml (1-line change) after approval and all CI checks passed.
97%
#423 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.16.6 (main) craft-store merged Renovate PR merged: bumped astral-sh/ruff-pre-commit hook from v0.16.5 to v0.16.6 in .pre-commit-config.yaml. Merged as commit 5e27906, later overtaken by v0.16.8 (#425) and v0.16.9 (#430).
97%