← Back to issue list

chore(docs): increment linkcheck retries

View original Github issue

Metadata

Project
rockcraft
Number
#700
Type
pull request
State
merged
Author
vpa1977
Labels
Created
Updated
Closed

Current evaluation

Merged. Increased linkcheck retries to three to prevent spurious documentation pipeline failures. Approved by three reviewers and passed CI checks.

Suggested action:

No scores available.

Issue body

Set linkcheck retries to 3 to avoid spurious pipeline failures during the linkcheck lint. By default linkcheck performs only one http(s) request. This causes spurious failures of linkcheck lint. - [x] Have you signed the [CLA](http://www.ubuntu.com/legal/contributors/)? -----

Evaluation history

Date Model Scores Action Summary
qwen/qwen3.6-35b-a3b Merged. Increased linkcheck retries to three to prevent spurious documentation pipeline failures. Approved by three reviewers and passed CI checks.
qwen3.6-35b-a3b-mtp-q6 Merged an external contribution increasing linkcheck HTTP request retries from one to three. This prevents spurious pipeline failures during documentation link validation by retrying failed requests.
qwen3.6-35b-a3b-mtp-q6 Merged. Increased linkcheck retries from one to three to prevent spurious pipeline failures during documentation linting. The change mitigates intermittent HTTP request timeouts by allowing additional retry attempts.

Update history

No update history recorded yet.

Related issues

Issue Project State Summary Similarity
#764 chore: fixes to things linking to the gnu website craft-parts merged Merged a chore update fixing links to the GNU website. Approved by two reviewers, passed CI, and modified two files with five additions and three deletions.
79%
#702 chore: fix docs spelling issues craft-parts merged Merged documentation corrections that fixed spelling errors across two files. Approved by two reviewers and passed CI, the changes were successfully integrated.
78%
#158 chore: update docstrings debcraft merged Merged updates to public function docstrings, adding missing parameters and return values. Approved by two reviewers, passed CI checks, and modified 10 files with 55 additions and 9 deletions.
77%
#2271 chore: release 3.4.5 charmcraft merged Merged as release 3.4.5. Approved by three reviewers. Two CI checks failed but did not block the merge.
75%
#2255 chore(docs): switch the docs to link to Juju 3.6 charmcraft merged Merged documentation update targeting the 3.4 hotfix branch to update links to Juju 3.6. Approved by three reviewers and passed CI checks. The change modifies a single line in one file, mirroring a similar main branch update.
74%
#1291 chore(ci): enable shellcheck charmcraft merged Merged. The change adds a single line to enable shellcheck in the CI pipeline. Approved by two reviewers with no comments or CI failures.
74%
#580 chore: update bld and store api urls fetch-service merged Merged after three approvals, updating the default configuration to support non-staging API URLs and resolving issue #571. CI completed with one scanner warning. Changes added five lines to one file.
74%
#773 chore: documentation polish craft-parts merged Documentation polish changes were approved by two reviewers, passed CI checks, and successfully merged. The update modified two files with 32 additions and 11 deletions.
74%
#907 chore(merge): 2.1.3 into main craft-parts merged Merged version 2.1.3 into main following approval from two reviewers and passing CI checks. The change updated seven files, adding 36 lines and removing 10.
73%
#529 chore: fix doc and yaml linting craft-parts merged Merged after two approvals and passing CI. Resolves documentation and YAML linting issues across three files. Net reduction of two lines. Local verification available via tox lint.
73%