build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.0
Metadata
Current evaluation
Renovate PR #407 bumped the astral-sh/ruff-pre-commit hook from v0.11.12 to v0.12.0 in .pre-commit-config.yaml; approved by 2 reviewers, all CI green, and merged to main as commit c576d42.
Resolution: closed resolved
Reason: The PR itself was the resolution: it was merged into main via commit c576d42 ("build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.0 (#407)"), a one-line change confirmed in the .pre-commit-config.yaml history. Later commits (e.g. #412, #422, #440) continue the same upgrade line.
Evaluated by: mr-cal-bot
No scores available.
Issue body
This PR contains the following updates:
| Package | Type | Update | Change |
|---|---|---|---|
| [astral-sh/ruff-pre-commit](https://redirect.github.com/astral-sh/ruff-pre-commit) | repository | minor | `v0.11.12` -> `v0.12.0` |
Note: The `pre-commit` manager in Renovate is not supported by the `pre-commit` maintainers or community. Please do not report any problems there, instead [create a Discussion in the Renovate repository](https://redirect.github.com/renovatebot/renovate/discussions/new) if you have any questions.
---
### Release Notes
<details>
<summary>astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)</summary>
### [`v0.12.0`](https://redirect.github.com/astral-sh/ruff-pre-commit/releases/tag/v0.12.0)
[Compare Source](https://redirect.github.com/astral-sh/ruff-pre-commit/compare/v0.11.13...v0.12.0)
See: https://github.com/astral-sh/ruff/releases/tag/0.12.0
### [`v0.11.13`](https://redirect.github.com/astral-sh/ruff-pre-commit/releases/tag/v0.11.13)
[Compare Source](https://redirect.github.com/astral-sh/ruff-pre-commit/compare/v0.11.12...v0.11.13)
See: https://github.com/astral-sh/ruff/releases/tag/0.11.13
</details>
---
### Configuration
📅 **Schedule**: Branch creation - "every weekend" in timezone Etc/UTC, Automerge - At any time (no schedule defined).
🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.
♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.
🔕 **Ignore**: Close this PR and you won't be reminded about this update again.
---
- [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box
---
This PR was generated by [Mend Renovate](https://mend.io/renovate/). View the [repository job log](https://developer.mend.io/github/canonical/starbase).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0MC42MC4xIiwidXBkYXRlZEluVmVyIjoiNDAuNjAuMSIsInRhcmdldEJyYW5jaCI6Im1haW4iLCJsYWJlbHMiOlsiZGVwZW5kZW5jaWVzIl19-->
Evaluation history
| Date | Model | Scores | Action | Summary |
|---|---|---|---|---|
| stealth/space-bunny-alpha | — | closed resolved | Renovate PR #407 bumped the astral-sh/ruff-pre-commit hook from v0.11.12 to v0.12.0 in .pre-commit-config.yaml; approved by 2 reviewers, all CI green, and merged to main as commit c576d42. | |
| stealth/space-bunny-alpha | — | closed resolved | Merged PR #407 upgraded the astral-sh/ruff-pre-commit hook from v0.11.12 to v0.12.0; two reviewers approved it and all CI checks passed. | |
| stealth/space-bunny-alpha | — | closed resolved | Merged in #407 via commit c576d42, updating the ruff-pre-commit hook from v0.11.12 to v0.12.0 after approval and successful CI checks. | |
| qwen/qwen3.6-35b-a3b | — | — | Merged an automated dependency update generated by Renovate. The astral-sh/ruff-pre-commit hook was upgraded from v0.11.12 to v0.12.0. Approved by two reviewers, passed all CI checks, and merged into the main branch. | |
| qwen3.6-35b-a3b-mtp-q6 | — | — | Merged automated dependency update upgrading astral-sh/ruff-pre-commit from v0.11.12 to v0.12.0. Generated by Renovate and manually merged per configuration. |
Update history
No update history recorded yet.
Related work
-
Related To:
canonical/starbase#412
(confidence 60%)
Follow-up Renovate bump to v0.12.4 on the same hook, showing the v0.12.x line landed successfully.
Related issues
| Issue | Project | State | Summary | Similarity |
|---|---|---|---|---|
| #848 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.8 (main) | craft-application | merged | Renovate PR bumping the astral-sh/ruff-pre-commit hook from v0.12.4 to v0.12.8 was merged via commit e503d5a1, approved with 2 reviewers and all CI checks green (1-line change in .pre-commit-config.yaml). | |
| #107 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.7 | craft-grammar | merged | Renovate PR merged: bumped the astral-sh/ruff-pre-commit pre-commit hook from v0.12.5 to v0.12.7 in .pre-commit-config.yaml (+1/-1), approved by 2 reviewers with all CI checks passing. | |
| #164 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.11 | craft-platforms | merged | Renovate PR merged (commit 41e391d), bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.12.9 to v0.12.11. Approved by 2 reviewers, all CI green; later superseded by many higher versions. | |
| #440 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.12 | starbase | merged | Renovate bumped the astral-sh/ruff-pre-commit pre-commit hook from v0.12.11 to v0.12.12 in .pre-commit-config.yaml. Approved (2 reviewers), all CI green, and merged into main via commit 5185e0a. | |
| #5742 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.11 (main) | snapcraft | merged | Renovate PR merged: bumped astral-sh/ruff-pre-commit hook v0.12.9 -> v0.12.11 in .pre-commit-config.yaml (commit 4defbc501), approved with all CI green. | |
| #171 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.1 | imagecraft | merged | Renovate PR merged, bumping the astral-sh/ruff-pre-commit hook from v0.12.0 to v0.12.1 in .pre-commit-config.yaml (1 file, +1/-1). Approved with 2 reviewers and merged into main. | |
| #114 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.9 | craft-grammar | merged | Renovate PR #114 was merged into main as commit ef0cbe6, bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.12.8 to v0.12.9 (1-line change, all CI green). | |
| #434 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.11 | starbase | merged | Renovate PR merged: bumped the astral-sh/ruff-pre-commit pre-commit hook in .pre-commit-config.yaml from v0.12.9 to v0.12.11 in commit cd7c68c, all CI checks passing. | |
| #154 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.7 | craft-platforms | merged | Renovate PR #154 bumped the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.12.5 to v0.12.7 (skipping yanked v0.12.6). Merged via commit c2fcb2b with all CI green. | |
| #884 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.11 (main) | craft-application | merged | Renovate PR merged into main via commit 476d4714, bumping the astral-sh/ruff-pre-commit pre-commit hook from v0.12.10 to v0.12.11 in .pre-commit-config.yaml; all CI checks passed. |