build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.0
Metadata
Current evaluation
Renovate PR merged as commit c8ecfbb, bumping the ruff-pre-commit hook from v0.12.12 to v0.13.0 in .pre-commit-config.yaml; all CI checks passed.
Resolution: closed resolved
Reason: The PR itself was the resolution: it merged into main as commit c8ecfbb ('build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.0 (#35)'), a one-line change to .pre-commit-config.yaml, with all reported CI checks green.
Evaluated by: mr-cal-bot
No scores available.
Issue body
Coming soon: The Renovate bot (GitHub App) will be renamed to Mend. PRs from Renovate will soon appear from 'Mend'. Learn more [here](https://redirect.github.com/renovatebot/renovate/discussions/37842).
This PR contains the following updates:
| Package | Type | Update | Change |
|---|---|---|---|
| [astral-sh/ruff-pre-commit](https://redirect.github.com/astral-sh/ruff-pre-commit) | repository | minor | `v0.12.12` -> `v0.13.0` |
Note: The `pre-commit` manager in Renovate is not supported by the `pre-commit` maintainers or community. Please do not report any problems there, instead [create a Discussion in the Renovate repository](https://redirect.github.com/renovatebot/renovate/discussions/new) if you have any questions.
---
### Release Notes
<details>
<summary>astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)</summary>
### [`v0.13.0`](https://redirect.github.com/astral-sh/ruff-pre-commit/releases/tag/v0.13.0)
[Compare Source](https://redirect.github.com/astral-sh/ruff-pre-commit/compare/v0.12.12...v0.13.0)
See: <https://github.com/astral-sh/ruff/releases/tag/0.13.0>
</details>
---
### Configuration
📅 **Schedule**: Branch creation - "every weekend" in timezone Etc/UTC, Automerge - At any time (no schedule defined).
🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.
♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.
🔕 **Ignore**: Close this PR and you won't be reminded about this update again.
---
- [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box
---
This PR was generated by [Mend Renovate](https://mend.io/renovate/). View the [repository job log](https://developer.mend.io/github/canonical/craft-artifacts).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0MS45Ny4xMCIsInVwZGF0ZWRJblZlciI6IjQxLjk3LjEwIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJQUjogRGVwZW5kZW5jaWVzIl19-->
Evaluation history
| Date | Model | Scores | Action | Summary |
|---|---|---|---|---|
| stealth/space-bunny-alpha | — | closed resolved | Renovate PR merged as commit c8ecfbb, bumping the ruff-pre-commit hook from v0.12.12 to v0.13.0 in .pre-commit-config.yaml; all CI checks passed. | |
| stealth/space-bunny-alpha | — | closed resolved | Merged #35, updating the Ruff pre-commit hook from v0.12.12 to v0.13.0; all reported CI checks passed. | |
| stealth/space-bunny-alpha | — | closed resolved | Merged PR #35 (commit c8ecfbb), updating the ruff-pre-commit hook from v0.12.12 to v0.13.0; all CI checks passed. | |
| qwen/qwen3.6-35b-a3b | — | — | Merged an automated Renovate PR upgrading the astral-sh/ruff-pre-commit hook from v0.12.12 to v0.13.0. The update passed all CI checks and received approval from two reviewers before being successfully merged. | |
| qwen3.6-35b-a3b-mtp-q6 | — | — | Merged an automated dependency update upgrading astral-sh/ruff-pre-commit from v0.12.12 to v0.13.0. The pull request, generated by the Renovate bot, was successfully integrated into the repository. |
Update history
No update history recorded yet.
Related work
-
Related To:
canonical/craft-artifacts#34
(confidence 80%)
Preceding ruff-pre-commit bump to v0.12.12 (commit 588d12e), superseded by this update.
-
Related To:
canonical/craft-artifacts#39
(confidence 70%)
Follow-up bump to v0.13.2 (commit 516ea29), superseding this version.
Related issues
| Issue | Project | State | Summary | Similarity |
|---|---|---|---|---|
| #22 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.1 | debcraft | merged | Renovate PR #22 bumped the ruff-pre-commit hook from v0.13.0 to v0.13.1 in .pre-commit-config.yaml and was auto-merged (commit 3f0c3f2) with all CI checks passing. | |
| #141 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.1 | craft-grammar | merged | Renovate PR #141 bumped the ruff-pre-commit hook from v0.13.0 to v0.13.1 in .pre-commit-config.yaml; merged via commit a6a9cad after 2 approvals and all CI checks passing. | |
| #135 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.0 | craft-grammar | merged | Renovate PR merged: the astral-sh/ruff-pre-commit pre-commit hook was bumped from v0.12.12 to v0.13.0 in .pre-commit-config.yaml, landing as commit 121c0b4 with all CI checks passing. | |
| #446 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.1 | starbase | merged | Renovate dependency PR #446 merged into main (commit 81daaa8), bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.13.0 to v0.13.1; all CI checks passed. | |
| #214 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.2 | imagecraft | merged | Renovate PR merged: ruff-pre-commit hook bumped v0.12.8 -> v0.13.2 in .pre-commit-config.yaml, landing as commit 4fa5f2b after 2 approvals and all CI checks passing. | |
| #451 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.14.0 | starbase | merged | Renovate PR merged: bumped astral-sh/ruff-pre-commit hook from v0.13.3 to v0.14.0 in .pre-commit-config.yaml (commit 885a3bf), all CI checks passing. | |
| #41 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.3 | craft-artifacts | merged | Renovate PR merged into main as commit 37c005b, bumping the astral-sh/ruff-pre-commit hook from v0.13.2 to v0.13.3 in .pre-commit-config.yaml (1-line change). | |
| #442 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.0 | starbase | merged | Renovate PR merged: bumped astral-sh/ruff-pre-commit hook v0.12.12 -> v0.13.0 in .pre-commit-config.yaml via commit 0d1ef52 on main, after 2 approvals and green CI. | |
| #42 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.14.0 | craft-artifacts | merged | Renovate PR merged via commit 633fca9, bumping the astral-sh/ruff-pre-commit hook from v0.13.3 to v0.14.0 in .pre-commit-config.yaml (1-line change), with all CI checks green. | |
| #434 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.11 | starbase | merged | Renovate PR merged: bumped the astral-sh/ruff-pre-commit pre-commit hook in .pre-commit-config.yaml from v0.12.9 to v0.12.11 in commit cd7c68c, all CI checks passing. |