build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.0
Metadata
Current evaluation
Renovate PR merged: the astral-sh/ruff-pre-commit pre-commit hook was bumped from v0.12.12 to v0.13.0 in .pre-commit-config.yaml, landing as commit 121c0b4 with all CI checks passing.
Resolution: closed resolved
Reason: PR #135 was approved by two reviewers and merged into main as commit 121c0b4 ("build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.0 (#135)"), a one-line diff in .pre-commit-config.yaml. Subsequent commits (e900817, 03e9201) show the hook was later bumped further, confirming the change landed.
Evaluated by: mr-cal-bot
No scores available.
Issue body
Coming soon: The Renovate bot (GitHub App) will be renamed to Mend. PRs from Renovate will soon appear from 'Mend'. Learn more [here](https://redirect.github.com/renovatebot/renovate/discussions/37842).
This PR contains the following updates:
| Package | Type | Update | Change |
|---|---|---|---|
| [astral-sh/ruff-pre-commit](https://redirect.github.com/astral-sh/ruff-pre-commit) | repository | minor | `v0.12.12` -> `v0.13.0` |
Note: The `pre-commit` manager in Renovate is not supported by the `pre-commit` maintainers or community. Please do not report any problems there, instead [create a Discussion in the Renovate repository](https://redirect.github.com/renovatebot/renovate/discussions/new) if you have any questions.
---
### Release Notes
<details>
<summary>astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)</summary>
### [`v0.13.0`](https://redirect.github.com/astral-sh/ruff-pre-commit/releases/tag/v0.13.0)
[Compare Source](https://redirect.github.com/astral-sh/ruff-pre-commit/compare/v0.12.12...v0.13.0)
See: <https://github.com/astral-sh/ruff/releases/tag/0.13.0>
</details>
---
### Configuration
📅 **Schedule**: Branch creation - "every weekend" in timezone Etc/UTC, Automerge - At any time (no schedule defined).
🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.
♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.
🔕 **Ignore**: Close this PR and you won't be reminded about this update again.
---
- [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box
---
This PR was generated by [Mend Renovate](https://mend.io/renovate/). View the [repository job log](https://developer.mend.io/github/canonical/craft-grammar).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0MS45Ny4xMCIsInVwZGF0ZWRJblZlciI6IjQxLjk3LjEwIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJQUjogRGVwZW5kZW5jaWVzIl19-->
Evaluation history
| Date | Model | Scores | Action | Summary |
|---|---|---|---|---|
| stealth/space-bunny-alpha | — | closed resolved | Renovate PR merged: the astral-sh/ruff-pre-commit pre-commit hook was bumped from v0.12.12 to v0.13.0 in .pre-commit-config.yaml, landing as commit 121c0b4 with all CI checks passing. | |
| stealth/space-bunny-alpha | — | closed resolved | Merged #135 in commit 121c0b4, updating the astral-sh/ruff-pre-commit hook from v0.12.12 to v0.13.0. | |
| stealth/space-bunny-alpha | — | closed resolved | Merged #135 in commit 121c0b4, updating the astral-sh/ruff-pre-commit hook from v0.12.12 to v0.13.0 after two approvals and all CI checks passed. | |
| qwen/qwen3.6-35b-a3b | — | — | Merged dependency update generated by Renovate. Updated astral-sh/ruff-pre-commit from v0.12.12 to v0.13.0. Approved by two reviewers, passed all CI checks, and successfully merged. |
Update history
No update history recorded yet.
Related work
-
Related To:
canonical/craft-grammar#187
(confidence 45%)
Later Renovate bump of the same ruff-pre-commit hook to v0.15.15 (commit 768c8cd), showing continued maintenance of the file changed here.
Related issues
| Issue | Project | State | Summary | Similarity |
|---|---|---|---|---|
| #35 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.0 | craft-artifacts | merged | Renovate PR merged as commit c8ecfbb, bumping the ruff-pre-commit hook from v0.12.12 to v0.13.0 in .pre-commit-config.yaml; all CI checks passed. | |
| #22 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.1 | debcraft | merged | Renovate PR #22 bumped the ruff-pre-commit hook from v0.13.0 to v0.13.1 in .pre-commit-config.yaml and was auto-merged (commit 3f0c3f2) with all CI checks passing. | |
| #434 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.11 | starbase | merged | Renovate PR merged: bumped the astral-sh/ruff-pre-commit pre-commit hook in .pre-commit-config.yaml from v0.12.9 to v0.12.11 in commit cd7c68c, all CI checks passing. | |
| #451 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.14.0 | starbase | merged | Renovate PR merged: bumped astral-sh/ruff-pre-commit hook from v0.13.3 to v0.14.0 in .pre-commit-config.yaml (commit 885a3bf), all CI checks passing. | |
| #145 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.0 | craft-platforms | merged | Renovate PR merged: bumped the astral-sh/ruff-pre-commit hook from v0.11.13 to v0.12.0 in .pre-commit-config.yaml, landing as commit 45b01b5. | |
| #442 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.0 | starbase | merged | Renovate PR merged: bumped astral-sh/ruff-pre-commit hook v0.12.12 -> v0.13.0 in .pre-commit-config.yaml via commit 0d1ef52 on main, after 2 approvals and green CI. | |
| #141 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.1 | craft-grammar | merged | Renovate PR #141 bumped the ruff-pre-commit hook from v0.13.0 to v0.13.1 in .pre-commit-config.yaml; merged via commit a6a9cad after 2 approvals and all CI checks passing. | |
| #214 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.13.2 | imagecraft | merged | Renovate PR merged: ruff-pre-commit hook bumped v0.12.8 -> v0.13.2 in .pre-commit-config.yaml, landing as commit 4fa5f2b after 2 approvals and all CI checks passing. | |
| #163 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.9 | craft-platforms | merged | Renovate PR updating the astral-sh/ruff-pre-commit hook from v0.12.8 to v0.12.9 in .pre-commit-config.yaml was approved and merged as commit 156c757, with all CI checks passing. | |
| #156 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.8 | craft-platforms | merged | Renovate PR merged: astral-sh/ruff-pre-commit bumped v0.12.7 -> v0.12.8 in .pre-commit-config.yaml (commit fa5b75f, 1 line changed), with all CI checks green. |