← Back to issue list

docs: fix jlink entry in changelog

View original Github issue

Metadata

Project
craft-parts
Number
#1191
Type
pull request
State
merged
Author
tigarmo
Labels
—
Created
Updated
Closed

Current evaluation

Merged PR #1191 in commit 6d4ce259, moving the jlink changelog entry to the release where the feature actually shipped after intervening releases.

Resolution: closed resolved

Reason: PR #1191 was approved and merged as commit 6d4ce259. It corrected the outdated release placement of the jlink entry in docs/reference/changelog.rst.

Evaluated by: mr-cal-bot

No scores available.

Issue body

The feature's PR took long enough that releases were made between PR creation and merging, so the changelog entry ended up for a release that had already happened. - [ ] Have you signed the [CLA](http://www.ubuntu.com/legal/contributors/)? - [ ] Have you added an entry to the changelog (`docs/reference/changelog.rst`)? -----

Evaluation history

Date Model Scores Action Summary
stealth/space-bunny-alpha — closed resolved Merged PR #1191 in commit 6d4ce259, moving the jlink changelog entry to the release where the feature actually shipped after intervening releases.
stealth/space-bunny-alpha — closed resolved Merged a changelog correction that moved the jlink entry to the release where the feature actually shipped, after intervening releases had made its original placement outdated.
stealth/space-bunny-alpha — closed resolved Merged a changelog correction to place the jlink entry in the appropriate release after intervening releases had shipped.
stealth/space-bunny-alpha — closed resolved Merged PR #1191, correcting the jlink changelog entry after intervening releases made its original release placement outdated.
stealth/space-bunny-alpha — closed resolved Merged a changelog fix moving the jlink entry to the correct release after intervening releases; both reviewers approved and all CI checks passed.
qwen/qwen3.6-35b-a3b — — Merged after two approvals and passing all CI checks. The changelog entry for the jlink feature was corrected to reflect the actual release date, as the original implementation was delayed past the scheduled release.
qwen3.6-35b-a3b-mtp-q6 — — Merged a documentation fix correcting a jlink changelog entry that referenced a past release due to delayed merging. The update aligns the changelog with the actual release timeline.

Update history

No update history recorded yet.

Related work

  • Related To: canonical/craft-parts#1169 (confidence 95%)

    This was the jlink feature PR whose delayed merge led to the changelog placement correction.

Related issues

Issue Project State Summary Similarity
#1017 docs: finalize changelog for 2.6.1 craft-parts merged Merged #1017, finalizing the 2.6.1 changelog with the jlink CPATH-scope and jdeps parameter-ordering fixes.
72%
#1014 fix: CPATH persistence craft-parts merged Merged PR #1014 fixed CPATH persistence and jdeps module-dependency handling in the Jlink plugin via commit d8d68365; released in 2.6.1.
71%
#416 docs: update changelog fetch-service merged Merged PR #416 as commit 7a74a80, adding six lines to the changelog after reviewer approval.
70%