build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.13
Metadata
Current evaluation
Merged Renovate PR #138, updating astral-sh/ruff-pre-commit from v0.11.12 to v0.11.13 in commit 2601a63.
Resolution: closed resolved
Reason: PR #138 was approved and merged into main as commit 2601a63. The reported ty diagnostics were unrelated, non-blocking notifications.
Evaluated by: mr-cal-bot
No scores available.
Issue body
This PR contains the following updates:
| Package | Type | Update | Change |
|---|---|---|---|
| [astral-sh/ruff-pre-commit](https://redirect.github.com/astral-sh/ruff-pre-commit) | repository | patch | `v0.11.12` -> `v0.11.13` |
Note: The `pre-commit` manager in Renovate is not supported by the `pre-commit` maintainers or community. Please do not report any problems there, instead [create a Discussion in the Renovate repository](https://redirect.github.com/renovatebot/renovate/discussions/new) if you have any questions.
---
### Release Notes
<details>
<summary>astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)</summary>
### [`v0.11.13`](https://redirect.github.com/astral-sh/ruff-pre-commit/releases/tag/v0.11.13)
[Compare Source](https://redirect.github.com/astral-sh/ruff-pre-commit/compare/v0.11.12...v0.11.13)
See: https://github.com/astral-sh/ruff/releases/tag/0.11.13
</details>
---
### Configuration
📅 **Schedule**: Branch creation - "every weekend" in timezone Etc/UTC, Automerge - At any time (no schedule defined).
🚦 **Automerge**: Enabled.
♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.
🔕 **Ignore**: Close this PR and you won't be reminded about this update again.
---
- [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box
---
This PR was generated by [Mend Renovate](https://mend.io/renovate/). View the [repository job log](https://developer.mend.io/github/canonical/craft-platforms).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0MC40MC4zIiwidXBkYXRlZEluVmVyIjoiNDAuNDAuMyIsInRhcmdldEJyYW5jaCI6Im1haW4iLCJsYWJlbHMiOlsiZGVwZW5kZW5jaWVzIl19-->
Evaluation history
| Date | Model | Scores | Action | Summary |
|---|---|---|---|---|
| stealth/space-bunny-alpha | — | closed resolved | Merged Renovate PR #138, updating astral-sh/ruff-pre-commit from v0.11.12 to v0.11.13 in commit 2601a63. | |
| qwen/qwen3.6-35b-a3b | — | closed resolved | Merged Renovate PR updating astral-sh/ruff-pre-commit from v0.11.12 to v0.11.13. Type checker warnings were noted as non-blocking notifications. |
Update history
| Date | Change |
|---|---|
| created |
Related issues
| Issue | Project | State | Summary | Similarity |
|---|---|---|---|---|
| #147 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.3 | craft-platforms | merged | Merged Renovate PR #147 updated ruff-pre-commit from v0.12.0 to v0.12.3 in commit 289758c. | |
| #154 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.12 | imagecraft | merged | Renovate PR #154 merged, updating ruff-pre-commit from v0.11.11 to v0.11.12 via commit 7e9e31d. | |
| #6134 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.15.8 (main) | snapcraft | merged | Merged Renovate PR #6134, updating the astral-sh/ruff-pre-commit hook from v0.15.6 to v0.15.8. | |
| #446 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.17.1 (main) | craft-store | merged | Merged Renovate PR updating the astral-sh/ruff-pre-commit pre-commit hook from v0.16.10 to v0.17.1. | |
| #211 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.17.1 (main) | debcraft | merged | Merged Renovate PR updating the astral-sh/ruff-pre-commit pre-commit hook from v0.16.10 to v0.17.1. | |
| #129 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.7 | craft-platforms | merged | Renovate PR #129 bumping the astral-sh/ruff-pre-commit hook from v0.11.6 to v0.11.7 was merged into main as commit 8b06291 (one-line .pre-commit-config.yaml change). | |
| #1380 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.14.2 (main) | craft-parts | merged | Merged the Renovate bump of astral-sh/ruff-pre-commit from v0.14.0 to v0.14.2 into main via commit a3045dbe. | |
| #150 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.11 | imagecraft | merged | Merged PR #150 upgraded astral-sh/ruff-pre-commit from v0.11.10 to v0.11.11 in commit cf2e5ea, with all CI checks passing. | |
| #134 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.5 | imagecraft | merged | Merged PR #134 updated astral-sh/ruff-pre-commit from v0.11.4 to v0.11.5 in commit 0395b58; all reported CI checks passed. | |
| #139 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.7 | imagecraft | merged | Renovate PR #139 merged (commit 2be8c57), bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.11.6 to v0.11.7 (+1/-1). |