← Back to issue list

build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.5

View original Github issue

Metadata

Project
imagecraft
Number
#134
Type
pull request
State
merged
Author
renovate[bot]
Labels
—
Created
Updated
Closed

Current evaluation

Merged PR #134 updated astral-sh/ruff-pre-commit from v0.11.4 to v0.11.5 in commit 0395b58; all reported CI checks passed.

Resolution: closed resolved

Reason: PR #134 was merged as commit 0395b58, applying the one-line hook version update. All listed CI checks passed.

Evaluated by: mr-cal-bot

No scores available.

Issue body

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [astral-sh/ruff-pre-commit](https://redirect.github.com/astral-sh/ruff-pre-commit) | repository | patch | `v0.11.4` -> `v0.11.5` | Note: The `pre-commit` manager in Renovate is not supported by the `pre-commit` maintainers or community. Please do not report any problems there, instead [create a Discussion in the Renovate repository](https://redirect.github.com/renovatebot/renovate/discussions/new) if you have any questions. --- ### Release Notes <details> <summary>astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)</summary> ### [`v0.11.5`](https://redirect.github.com/astral-sh/ruff-pre-commit/releases/tag/v0.11.5) [Compare Source](https://redirect.github.com/astral-sh/ruff-pre-commit/compare/v0.11.4...v0.11.5) See: https://github.com/astral-sh/ruff/releases/tag/0.11.5 </details> --- ### Configuration 📅 **Schedule**: Branch creation - "every weekend" in timezone Etc/UTC, Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR was generated by [Mend Renovate](https://mend.io/renovate/). View the [repository job log](https://developer.mend.io/github/canonical/imagecraft). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOS4yMzguMCIsInVwZGF0ZWRJblZlciI6IjM5LjIzOC4wIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJkZXBlbmRlbmNpZXMiXX0=-->

Evaluation history

Date Model Scores Action Summary
stealth/space-bunny-alpha — closed resolved Merged PR #134 updated astral-sh/ruff-pre-commit from v0.11.4 to v0.11.5 in commit 0395b58; all reported CI checks passed.
stealth/space-bunny-alpha — closed resolved Merged PR #134 bumped astral-sh/ruff-pre-commit from v0.11.4 to v0.11.5 in commit 0395b58.
stealth/space-bunny-alpha — closed resolved Renovate PR #134 bumped the ruff-pre-commit hook from v0.11.4 to v0.11.5 in .pre-commit-config.yaml; merged as commit 0395b58 with all CI checks passing and 2 approvals.
stealth/space-bunny-alpha — closed resolved Renovate's routine dependency bump of the astral-sh/ruff-pre-commit pre-commit hook from v0.11.4 to v0.11.5 was merged into main (commit 0395b58), a one-line change in .pre-commit-config.yaml.
stealth/space-bunny-alpha — closed resolved Merged PR #134 updated the ruff-pre-commit hook from v0.11.4 to v0.11.5; all reported CI checks passed.
qwen/qwen3.6-35b-a3b — — Merged automated dependency update upgrading astral-sh/ruff-pre-commit from v0.11.4 to v0.11.5. Approved by two reviewers, passed all CI checks, and merged via automerge.
qwen3.6-35b-a3b-mtp-q6 — — Automated dependency update merged astral-sh/ruff-pre-commit from v0.11.4 to v0.11.5. The pull request was automatically merged into the main branch by the Renovate bot.

Update history

No update history recorded yet.

Related issues

Issue Project State Summary Similarity
#150 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.11 imagecraft merged Merged PR #150 upgraded astral-sh/ruff-pre-commit from v0.11.10 to v0.11.11 in commit cf2e5ea, with all CI checks passing.
99%
#434 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.11 starbase merged Renovate PR merged: bumped the astral-sh/ruff-pre-commit pre-commit hook in .pre-commit-config.yaml from v0.12.9 to v0.12.11 in commit cd7c68c, all CI checks passing.
97%
#154 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.12 imagecraft merged Renovate PR #154 merged, updating ruff-pre-commit from v0.11.11 to v0.11.12 via commit 7e9e31d.
97%
#8 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.8 debcraft merged Merged PR #422 updated Ruff's pre-commit hook from v0.11.13 to v0.12.8 in commit 0d4544f; all reported CI checks passed.
97%
#5 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.12 debcraft merged Renovate PR #5 was merged, updating ruff-pre-commit from v0.11.11 to v0.11.12; the one-line dependency change passed all CI checks.
97%
#394 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.12 starbase merged Renovate PR #394 merged to main as commit 5236f2a, bumping the astral-sh/ruff-pre-commit hook from v0.11.11 to v0.11.12 in .pre-commit-config.yaml. All CI checks passed; later hook bumps followed (e.g. #412, #580).
97%
#144 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.8 imagecraft merged Renovate PR merged as commit 9503d58, bumping the astral-sh/ruff-pre-commit hook from v0.11.7 to v0.11.8 in .pre-commit-config.yaml. All CI checks passed; hook has since advanced to v0.16.9.
97%
#184 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.5 (main) craft-archives merged Merged #184 in commit 8601773, updating astral-sh/ruff-pre-commit from v0.12.3 to v0.12.5; all CI checks passed.
97%
#390 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.11 starbase merged Renovate PR merged into main as commit b532d9a, bumping the astral-sh/ruff-pre-commit hook in .pre-commit-config.yaml from v0.11.6 to v0.11.11 (+1/-1 line); all CI checks passed and it was approved by 2 reviewers.
97%
#199 build(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.12.9 (main) craft-archives merged Merged PR #199 updated ruff-pre-commit from v0.12.8 to v0.12.9 in commit c9b9531; all listed CI checks passed.
97%