chore: merge hotfix/1.19
Metadata
Current evaluation
Merged hotfix/1.19 into main as the corrected second attempt after #477 was reverted; landed in commit d7ec90f.
Resolution: closed resolved
Reason: PR #478 was merged into main in commit d7ec90f, restoring hotfix/1.19 after #477 was reverted because its history had accidentally been squash-merged.
Evaluated by: mr-cal-bot
No scores available.
Issue body
- [x] Have you followed the guidelines for contributing?
- [x] Have you signed the [CLA](http://www.ubuntu.com/legal/contributors/)?
- [x] Have you successfully run `tox`?
-----
Second attempt of #477, which was reverted because I accidentally squash-merged the PR.
Evaluation history
| Date | Model | Scores | Action | Summary |
|---|---|---|---|---|
| stealth/space-bunny-alpha | — | closed resolved | Merged hotfix/1.19 into main as the corrected second attempt after #477 was reverted; landed in commit d7ec90f. | |
| qwen/qwen3.6-35b-a3b | — | closed resolved | Merged hotfix/1.19 branch into main as a second attempt after #477 was reverted due to accidental squash-merge. |
Update history
| Date | Change |
|---|---|
| created |
Related work
-
Related To:
canonical/craft-providers#477
(confidence 100%)
The first hotfix/1.19 merge attempt was reverted; #478 explicitly served as its second attempt.
Related issues
| Issue | Project | State | Summary | Similarity |
|---|---|---|---|---|
| #477 chore: merge hotfix/1.19 | craft-providers | merged | Merged hotfix/1.19 into main via commit d7ec90f (PR #478), incorporating the 1.19 maintenance changes. | |
| #537 chore(merge): 'hotfix/1.20' into 'main' | craft-providers | merged | Merged hotfix/1.20 into main via commit 0b1d043 (#537), bringing the approved hotfix branch into the main line. | |
| #1121 chore(merge): hotfix/1.17 into main | rockcraft | merged | Merged hotfix/1.17 into main via #1121; history records merge commits a90fcd1c and cf1659f8 after two approvals. | |
| #924 chore(merge): hotfix/2.1 into main | craft-parts | closed | Merged hotfix/2.1 into main through PR #924, carrying 10 changed files (+50/-16). | |
| #1120 chore(merge): hotfix/1.17 into main | rockcraft | closed | Merge PR #1120 was closed after CI failures; follow-up #1121 repeated the hotfix/1.17-to-main merge and was merged in commits a90fcd1c/cf1659f8. | |
| #491 chore(merge): merge 'hotfix/1.2' back to 'main' | rockcraft | merged | Merged hotfix/1.2 back into main via #491 (commit bd69420e), with two approvals. | |
| #563 chore(merge): 'hotfix/1.3' into 'main' | rockcraft | merged | Merged hotfix/1.3 into main in commit 5200e42, with no net file changes; the PR received two approvals. | |
| #1394 chore(merge): merge hotfix/1.21 back to main | rockcraft | merged | Merged hotfix/1.21 branch back into main to propagate recent fixes to the development branch. | |
| #630 chore(merge): 'hotfix/1.5' into 'main' | rockcraft | merged | Merged hotfix/1.5 into main via PR #630 at commit 1a5740ad after two approvals; 4 files changed (+13/-12). | |
| #1277 chore(merge): hotfix/1.19 to main | rockcraft | merged | Merged hotfix/1.19 into main via #1277, bringing the 1.19.2 maintenance changes, including release notes from #1275, into the main line. |