← Back to issue list

chore(merge): merge hotfix/1.21 back to main

View original Github issue

Metadata

Project
rockcraft
Number
#1394
Type
pull request
State
merged
Author
tigarmo
Labels
—
Created
Updated
Closed

Current evaluation

Merged hotfix/1.21 branch back into main to propagate recent fixes to the development branch.

Resolution: closed resolved

Reason: The PR was merged by maintainer tigarmo after passing all CI checks, updating 2 files with +5/-5 lines.

Evaluated by: mr-cal-bot

No scores available.

Issue body

--- - [ ] I've followed the [contribution guidelines](https://github.com/canonical/rockcraft/blob/main/CONTRIBUTING.md). - [ ] I've signed the [CLA](http://www.ubuntu.com/legal/contributors/). - [ ] I've successfully run `make lint && make test`. - [ ] I've added or updated any relevant documentation. - [ ] In documents I changed, I [added a meta description](https://canonical-starflow.readthedocs-hosted.com/how-to/add-a-page-meta-description/) if one was missing. - [ ] I've updated the relevant release notes.

Evaluation history

Date Model Scores Action Summary
qwen/qwen3.6-35b-a3b — closed resolved Merged hotfix/1.21 branch back into main to propagate recent fixes to the development branch.

Update history

Date Change
merged
updated
updated
created

Related issues

Issue Project State Summary Similarity
#537 chore(merge): 'hotfix/1.20' into 'main' craft-providers merged Merged hotfix/1.20 into main via commit 0b1d043 (#537), bringing the approved hotfix branch into the main line.
93%
#511 chore(merge): merge 'hotfix/1.2' back into 'main' rockcraft merged Merged hotfix/1.2 back into main via PR #511 (commit 0ef121f3), bringing the 1.2 maintenance fixes forward with two approvals.
91%
#1392 chore(merge): merge hotfix/1.21 back into main rockcraft closed Merged hotfix/1.21 into main, updating craft-parts to fix the pathlib performance regression.
90%
#491 chore(merge): merge 'hotfix/1.2' back to 'main' rockcraft merged Merged hotfix/1.2 back into main via #491 (commit bd69420e), with two approvals.
90%
#558 chore: merge 'hotfix/1.3' back into 'main' rockcraft merged Merged hotfix/1.3 back into main via PR #558, integrating the maintenance branch into the main line.
90%
#500 chore(merge): merge 'hotfix/1.2' back into 'main' rockcraft merged Merged PR #500 back-merged hotfix/1.2 into main after approval by two reviewers, with no unresolved comments.
90%
#470 chore(merge): merge 'hotfix/1.1' back to main rockcraft closed Back-merge PR of hotfix/1.1 into main was approved by tigarmo but closed with an empty diff (0 files changed), leaving the 1.1 maintenance fixes integrated another way.
90%
#477 chore: merge hotfix/1.19 craft-providers merged Merged hotfix/1.19 into main via commit d7ec90f (PR #478), incorporating the 1.19 maintenance changes.
90%
#924 chore(merge): hotfix/2.1 into main craft-parts closed Merged hotfix/2.1 into main through PR #924, carrying 10 changed files (+50/-16).
89%
#1277 chore(merge): hotfix/1.19 to main rockcraft merged Merged hotfix/1.19 into main via #1277, bringing the 1.19.2 maintenance changes, including release notes from #1275, into the main line.
89%