chore(merge): merge hotfix/1.21 back into main
Metadata
Current evaluation
Merged hotfix/1.21 into main, updating craft-parts to fix the pathlib performance regression.
Resolution: closed resolved
Reason: The PR was merged into main, incorporating the craft-parts dependency bump that addresses the pathlib performance regression as described in the PR body.
Evaluated by: mr-cal-bot
No scores available.
Issue body
The only change is the craft-parts bump for the pathlib perf regression.
---
- [ ] I've followed the [contribution guidelines](https://github.com/canonical/rockcraft/blob/main/CONTRIBUTING.md).
- [ ] I've signed the [CLA](http://www.ubuntu.com/legal/contributors/).
- [ ] I've successfully run `make lint && make test`.
- [ ] I've added or updated any relevant documentation.
- [ ] In documents I changed, I [added a meta description](https://canonical-starflow.readthedocs-hosted.com/how-to/add-a-page-meta-description/) if one was missing.
- [ ] I've updated the relevant release notes.
Evaluation history
| Date | Model | Scores | Action | Summary |
|---|---|---|---|---|
| qwen/qwen3.6-35b-a3b | — | closed resolved | Merged hotfix/1.21 into main, updating craft-parts to fix the pathlib performance regression. |
Update history
| Date | Change |
|---|---|
| closed | |
| updated | |
| created |
Related issues
| Issue | Project | State | Summary | Similarity |
|---|---|---|---|---|
| #1394 chore(merge): merge hotfix/1.21 back to main | rockcraft | merged | Merged hotfix/1.21 branch back into main to propagate recent fixes to the development branch. | |
| #537 chore(merge): 'hotfix/1.20' into 'main' | craft-providers | merged | Merged hotfix/1.20 into main via commit 0b1d043 (#537), bringing the approved hotfix branch into the main line. | |
| #924 chore(merge): hotfix/2.1 into main | craft-parts | closed | Merged hotfix/2.1 into main through PR #924, carrying 10 changed files (+50/-16). | |
| #630 chore(merge): 'hotfix/1.5' into 'main' | rockcraft | merged | Merged hotfix/1.5 into main via PR #630 at commit 1a5740ad after two approvals; 4 files changed (+13/-12). | |
| #1277 chore(merge): hotfix/1.19 to main | rockcraft | merged | Merged hotfix/1.19 into main via #1277, bringing the 1.19.2 maintenance changes, including release notes from #1275, into the main line. | |
| #558 chore: merge 'hotfix/1.3' back into 'main' | rockcraft | merged | Merged hotfix/1.3 back into main via PR #558, integrating the maintenance branch into the main line. | |
| #491 chore(merge): merge 'hotfix/1.2' back to 'main' | rockcraft | merged | Merged hotfix/1.2 back into main via #491 (commit bd69420e), with two approvals. | |
| #511 chore(merge): merge 'hotfix/1.2' back into 'main' | rockcraft | merged | Merged hotfix/1.2 back into main via PR #511 (commit 0ef121f3), bringing the 1.2 maintenance fixes forward with two approvals. | |
| #332 chore(merge): merge 'hotfix/2.6' into 'main' | craft-application | merged | Merged hotfix/2.6 into main via #332 (d767efcc/c9dc15be), including fixes for issues exposed by the latest Ruff. | |
| #1011 chore(merge): 2.3.1 into main | craft-parts | merged | Merged Craft Parts 2.3.1 into main via #1011 (commit 62c23709), adding the changelog and crate.io ignore; functional hotfix changes were already on main. |