← Back to issue list

chore: test craft-cli changes

View original Github issue

Metadata

Project
rockcraft
Number
#699
Type
pull request
State
closed
Author
dariuszd21
Labels
—
Created
Updated
Closed

Current evaluation

Temporary test PR for canonical/craft-cli#271 was closed unmerged after ~2 years idle: no reviews, CI, comments, or resolving commit. The craft-cli change itself landed separately in 73e896e.

Resolution: closed stale

Reason: The PR was a throwaway branch that only checked whether canonical/craft-cli#271 ('feat: display positional args in help') broke rockcraft; it sat with review status pending and zero CI runs or comments, then was closed unmerged after roughly 757 days of inactivity. The upstream change it exercised shipped independently in craft-cli commit 73e896e, so nothing remained to land in rockcraft.

Evaluated by: mr-cal-bot

No scores available.

Issue body

- [ ] Have you signed the [CLA](http://www.ubuntu.com/legal/contributors/)? This PR only checks if changes introduced in https://github.com/canonical/craft-cli/pull/271 breaks something

Evaluation history

Date Model Scores Action Summary
stealth/space-bunny-alpha — closed stale Temporary test PR for canonical/craft-cli#271 was closed unmerged after ~2 years idle: no reviews, CI, comments, or resolving commit. The craft-cli change itself landed separately in 73e896e.
stealth/space-bunny-alpha — closed stale Closed unmerged without review, CI, comments, or a resolving commit after two years of inactivity; it was a temporary test of canonical/craft-cli#271, which merged separately.
qwen/qwen3.6-35b-a3b — — Closed without merging. The temporary test for upstream craft-cli changes received no reviews, CI checks, or comments. Likely abandoned due to inactivity shortly after creation.
qwen3.6-35b-a3b-mtp-q6 — — Closed without merging. The pull request tested upstream craft-cli changes but was abandoned, with no comments or resolution details provided.

Update history

No update history recorded yet.

Related work

  • Related To: canonical/craft-cli#271 (confidence 95%)

    The upstream PR this rockcraft branch was testing; it merged as craft-cli commit 73e896e, rendering the temporary test branch obsolete.

Related issues

Issue Project State Summary Similarity
#5641 chore: test craft-providers change snapcraft closed Closed unmerged due to inactivity; the PR received no reviews or comments, and the integration-spread-tests-store CI job failed.
79%
#1123 tests: test craft-cli git charmcraft closed Closed unmerged after about 1,204 days without review, CI, comments, or a replacement; the two-line test update appears abandoned.
78%
#5237 chore: test backstage snapcraft closed PR #5237 by maintainer lengau, a 2-line "chore: test backstage" experiment, was closed unmerged after ~600 days with no reviews, comments, CI runs, or resolving commit.
76%
#5016 [do-not-merge] chore: check craft-cli changes snapcraft closed Closed unmerged as an abandoned do-not-merge probe; craft-cli#271 merged as 73e896e, and snapcraft#5021 later updated craft-cli to v2.7.0.
76%
#5166 chore!: use dev craft-parts snapcraft closed Closed unmerged as a test branch; #5149 superseded it and added Git as craft.git in commit c7d11ac65.
75%
#506 chore: update to the latest craft-application rockcraft closed Closed unmerged after craft-application 2.0's required build_plan argument broke test helpers; the draft went inactive. A later port landed in commit de242431.
75%
#486 chore(merge): 'main' into 'work/CRAFT-3154/craft-platforms' craft-application closed Closed unmerged after prolonged inactivity, with no reviews or CI. Pydantic 2 had landed via #401 (c2f0978a); craft-platforms work later continued in #495 (3bd339cf).
74%
#466 chore: update changelog and fix local lxd craft-test fetch-service merged Merged PR #466 as commit 9bfa739, updating the changelog and fixing local LXD inspection craft-test; all CI checks passed.
73%
#594 chore(alex): he dunit craft-application closed Closed unmerged after roughly 651 days without CI, review, or further activity; the one-line alex change was abandoned with no resolving commit or follow-up PR.
72%
#392 chore(deps): update dependency craft-cli to v2.3.0 rockcraft merged Renovate PR merged as commit f0c2fc06, bumping craft-cli from ==2.1.0 to ==2.3.0 across requirements.txt and lock files (+3/-3, 3 files). Approved by 2 reviewers; craft-cli later raised to 2.5.0 in #413.
72%