← Back to issue list

chore(merge): hotfix/8.11 into main

View original Github issue

Metadata

Project
snapcraft
Number
#5745
Type
pull request
State
closed
Author
bepri
Labels
PR: Merge
Created
Updated
Closed

Current evaluation

Superseded by PR #5747, which merged hotfix/8.11 into main as commit 3005d50aa for the 8.12 release.

Resolution: closed superseded

Reason: PR #5745 was replaced by the resubmitted merge PR #5747, which merged hotfix/8.11 into main in commit 3005d50aa. The replacement PR was approved and landed for the 8.12 release.

Evaluated by: mr-cal-bot

No scores available.

Issue body

- [x] Have you followed the [guidelines for contributing](https://github.com/canonical/snapcraft/blob/main/CONTRIBUTING.md)? - [x] Have you signed the [CLA](http://www.ubuntu.com/legal/contributors/)? - [ ] Have you successfully run `make lint`? - [ ] Have you successfully run `make test`? ---

Evaluation history

Date Model Scores Action Summary
stealth/space-bunny-alpha — closed superseded Superseded by PR #5747, which merged hotfix/8.11 into main as commit 3005d50aa for the 8.12 release.
stealth/space-bunny-alpha — closed superseded hotfix/8.11 merge into main landed, but this PR was closed unmerged and superseded by the identical PR #5747, merged as commit 3005d50aa. Release notes for 8.12.0 followed in #5752.
stealth/space-bunny-alpha — closed superseded Superseded by canonical/snapcraft#5747, which merged hotfix/8.11 into main in commit 3005d50aa to prepare Snapcraft 8.12.
stealth/space-bunny-alpha — closed superseded Merge PR for hotfix/8.11 into main was closed unmerged; the same merge landed instead via PR #5747 (commit 3005d50aa), ahead of the 8.12.0 release (release notes PR #5752).
stealth/space-bunny-alpha — closed resolved Merged hotfix/8.11 into main via PR #5747, preparing the 8.12 release; all CI checks passed and two reviewers approved.
qwen/qwen3.6-35b-a3b — — Merged hotfix/8.11 into main. All CI checks passed successfully. The pull request was closed after integration without reviewer comments or test failures.
qwen3.6-35b-a3b-mtp-q6 — — Merged hotfix/8.11 into main. The maintainer closed the pull request after successfully integrating the hotfix branch into the main branch.

Update history

No update history recorded yet.

Related work

  • Superseded By: snapcraft#5747 (confidence 99%)

    Resubmission of the same hotfix/8.11 merge; merged as commit 3005d50aa.

Related issues

Issue Project State Summary Similarity
#1177 chore(merge): hotfix/7.2 into main craft-application merged Merged hotfix/7.2 into main in commit 56398be7; fixes were already cherry-picked, and PR #1177 added the 7.2.1 changelog entry.
90%
#5669 chore(merge): hotfix/8.10 into main snapcraft merged Merged hotfix/8.10 into main ahead of 8.11 via #5669 (commit 404316016); the unrelated integration-spread-tests-store failure did not block the merge.
89%
#6028 chore(merge): hotfix/8.14 into main snapcraft merged Merged hotfix/8.14 into main via commit e8deb5855, bringing its CI fixes onto main after two approvals.
89%
#831 chore(merge): 'hotfix/5.6' into 'main' craft-application closed Closed as superseded by #832, which merged hotfix/5.6 into main at commit 8c644216 after all CI checks passed.
89%
#924 chore(merge): hotfix/2.1 into main craft-parts closed Merged hotfix/2.1 into main through PR #924, carrying 10 changed files (+50/-16).
87%
#630 chore(merge): 'hotfix/1.5' into 'main' rockcraft merged Merged hotfix/1.5 into main via PR #630 at commit 1a5740ad after two approvals; 4 files changed (+13/-12).
87%
#537 chore(merge): 'hotfix/1.20' into 'main' craft-providers merged Merged hotfix/1.20 into main via commit 0b1d043 (#537), bringing the approved hotfix branch into the main line.
87%
#1120 chore(merge): hotfix/1.17 into main rockcraft closed Merge PR #1120 was closed after CI failures; follow-up #1121 repeated the hotfix/1.17-to-main merge and was merged in commits a90fcd1c/cf1659f8.
86%
#5044 chore(merge): work/merge-8.3-8.4 into main snapcraft merged Merged #5044 into main, integrating hotfix/8.3 and hotfix/8.4 with two approvals; the branch was re-merged after main changed.
86%
#6441 chore(merge): hotfix/9.0 into main snapcraft merged Merged hotfix/9.0 into main via PR #6441, including documentation changes omitted from hotfix/9.1; approval and all CI checks passed.
86%