← Back to issue list

chore(merge): hotfix/8.14 into main

View original Github issue

Metadata

Project
snapcraft
Number
#6028
Type
pull request
State
merged
Author
mr-cal
Labels
PR: Merge
Created
Updated
Closed

Current evaluation

Merged hotfix/8.14 into main via commit e8deb5855, bringing its CI fixes onto main after two approvals.

Resolution: closed resolved

Reason: PR #6028 was merged into main as commit e8deb5855. Its stated purpose was to carry the hotfix/8.14 CI fixes into main.

Evaluated by: mr-cal-bot

No scores available.

Issue body

Pulls in hotfix/8.14, primarily because I want the CI fixes on main. --- - [X] I've followed the [contribution guidelines](https://github.com/canonical/snapcraft/blob/main/CONTRIBUTING.md). - [X] I've signed the [CLA](http://www.ubuntu.com/legal/contributors/). - [X] I've successfully run `make lint && make test`. - [ ] I've added or updated any relevant documentation. - [ ] I've updated the relevant release notes.

Evaluation history

Date Model Scores Action Summary
stealth/space-bunny-alpha — closed resolved Merged hotfix/8.14 into main via commit e8deb5855, bringing its CI fixes onto main after two approvals.
stealth/space-bunny-alpha — closed resolved Merged hotfix/8.14 into main via #6028 (e8deb5855), bringing its CI fixes forward after two approvals.
stealth/space-bunny-alpha — closed resolved Merged hotfix/8.14 into main in commit e8deb5855 (#6028), bringing the branch's CI fixes to main after two approvals.
qwen/qwen3.6-35b-a3b — — Merged hotfix/8.14 into main to bring CI fixes to the primary branch. Approved by two reviewers and passed CI checks. Updated 25 files with 268 additions and 76 deletions.
qwen3.6-35b-a3b-mtp-q6 — — Merged hotfix/8.14 into main to integrate CI fixes. Linting and testing passed before the maintainer successfully completed the merge.

Update history

No update history recorded yet.

Related issues

Issue Project State Summary Similarity
#537 chore(merge): 'hotfix/1.20' into 'main' craft-providers merged Merged hotfix/1.20 into main via commit 0b1d043 (#537), bringing the approved hotfix branch into the main line.
91%
#832 chore(merge): 'hotfix/5.6' into 'main' craft-application merged Merged hotfix/5.6 into main via #832 at commit 8c644216; two reviewers approved and all CI checks passed.
90%
#6441 chore(merge): hotfix/9.0 into main snapcraft merged Merged hotfix/9.0 into main via PR #6441, including documentation changes omitted from hotfix/9.1; approval and all CI checks passed.
90%
#1177 chore(merge): hotfix/7.2 into main craft-application merged Merged hotfix/7.2 into main in commit 56398be7; fixes were already cherry-picked, and PR #1177 added the 7.2.1 changelog entry.
90%
#630 chore(merge): 'hotfix/1.5' into 'main' rockcraft merged Merged hotfix/1.5 into main via PR #630 at commit 1a5740ad after two approvals; 4 files changed (+13/-12).
89%
#5044 chore(merge): work/merge-8.3-8.4 into main snapcraft merged Merged #5044 into main, integrating hotfix/8.3 and hotfix/8.4 with two approvals; the branch was re-merged after main changed.
89%
#563 chore(merge): 'hotfix/1.3' into 'main' rockcraft merged Merged hotfix/1.3 into main in commit 5200e42, with no net file changes; the PR received two approvals.
89%
#1121 chore(merge): hotfix/1.17 into main rockcraft merged Merged hotfix/1.17 into main via #1121; history records merge commits a90fcd1c and cf1659f8 after two approvals.
89%
#924 chore(merge): hotfix/2.1 into main craft-parts closed Merged hotfix/2.1 into main through PR #924, carrying 10 changed files (+50/-16).
89%
#5745 chore(merge): hotfix/8.11 into main snapcraft closed Superseded by PR #5747, which merged hotfix/8.11 into main as commit 3005d50aa for the 8.12 release.
89%