chore(merge): merge 'hotfix/1.1' back to main
Metadata
Current evaluation
Back-merge PR of hotfix/1.1 into main was approved by tigarmo but closed with an empty diff (0 files changed), leaving the 1.1 maintenance fixes integrated another way.
Resolution: closed stale
Reason: PR #470 was opened only to merge hotfix/1.1 back into main; it shows an approved review but an empty diff (+0/-0) and was closed rather than merged, with no comments or CI activity explaining why. Equivalent 1.1.x fix work (e.g. the Chisel spread-test cherry-pick in #469/#466) landed on the hotfix branch independently, so the back-merge PR was abandoned by the maintainer without resolution.
Evaluated by: mr-cal-bot
Issue body
Evaluation history
| Date | Model | Scores | Action | Summary |
|---|---|---|---|---|
| stealth/space-bunny-alpha | — | closed stale | Back-merge PR of hotfix/1.1 into main was approved by tigarmo but closed with an empty diff (0 files changed), leaving the 1.1 maintenance fixes integrated another way. | |
| stealth/space-bunny-alpha | — | closed resolved | hotfix/1.1 was merged back into main by maintainer tigarmo; the approved PR was closed with no file changes. | |
| qwen/qwen3.6-35b-a3b | — | — | Closed after routine merge of 'hotfix/1.1' back to main. Approved by one reviewer with zero code changes, indicating a straightforward merge operation. | |
| qwen3.6-35b-a3b-mtp-q6 | — | — | Merged hotfix/1.1 into main. The pull request was closed following successful integration, finalizing the version 1.1 release. |
Update history
No update history recorded yet.
Related work
-
Related To:
canonical/rockcraft#469
(confidence 70%)
Merged the Chisel fix cherry-picked into the 1.1.2 hotfix branch (#466, b3bc4d70), one of the changes the back-merge PR #470 targeted.
-
Related To:
canonical/rockcraft#500
(confidence 45%)
Later hotfix/1.2 back-merge into main that was actually merged, showing the project's normal pattern for these merges.
-
Related To:
canonical/rockcraft#471
(confidence 30%)
Adjacent schema fix merged just after #470; part of the same 1.1 maintenance line but not the back-merge itself.
Related issues
| Issue | Project | State | Summary | Similarity |
|---|---|---|---|---|
| #511 chore(merge): merge 'hotfix/1.2' back into 'main' | rockcraft | merged | Merged hotfix/1.2 back into main via PR #511 (commit 0ef121f3), bringing the 1.2 maintenance fixes forward with two approvals. | |
| #500 chore(merge): merge 'hotfix/1.2' back into 'main' | rockcraft | merged | Merged PR #500 back-merged hotfix/1.2 into main after approval by two reviewers, with no unresolved comments. | |
| #630 chore(merge): 'hotfix/1.5' into 'main' | rockcraft | merged | Merged hotfix/1.5 into main via PR #630 at commit 1a5740ad after two approvals; 4 files changed (+13/-12). | |
| #491 chore(merge): merge 'hotfix/1.2' back to 'main' | rockcraft | merged | Merged hotfix/1.2 back into main via #491 (commit bd69420e), with two approvals. | |
| #563 chore(merge): 'hotfix/1.3' into 'main' | rockcraft | merged | Merged hotfix/1.3 into main in commit 5200e42, with no net file changes; the PR received two approvals. | |
| #558 chore: merge 'hotfix/1.3' back into 'main' | rockcraft | merged | Merged hotfix/1.3 back into main via PR #558, integrating the maintenance branch into the main line. | |
| #1394 chore(merge): merge hotfix/1.21 back to main | rockcraft | merged | Merged hotfix/1.21 branch back into main to propagate recent fixes to the development branch. | |
| #537 chore(merge): 'hotfix/1.20' into 'main' | craft-providers | merged | Merged hotfix/1.20 into main via commit 0b1d043 (#537), bringing the approved hotfix branch into the main line. | |
| #478 chore(merge): merge 'hotfix-1.1' into 'main' | rockcraft | closed | Closed unmerged: #478 was an empty, mis-targeted hotfix merge. The follow-up #491 merged hotfix/1.2 back into main. | |
| #924 chore(merge): hotfix/2.1 into main | craft-parts | closed | Merged hotfix/2.1 into main through PR #924, carrying 10 changed files (+50/-16). |