chore(merge): hotfix/8.14 into feature/ubuntu-kernel-plugin
Metadata
Current evaluation
Merged hotfix/8.14 into feature/ubuntu-kernel-plugin to bypass unstable Snapcraft 9 changes on main. Approved by two reviewers and passed CI checks despite one failing store test. 52 files changed.
Suggested action: —
No scores available.
Issue body
Merges `hotfix/8.14` into `feature/ubuntu-kernel-plugin`. I chose `hotfix/8.14`, since `main` has Snapcraft 9 changes in-progress and isn't production ready.
Similar to https://github.com/canonical/snapcraft/pull/6040
---
- [x] I've followed the [contribution guidelines](https://github.com/canonical/snapcraft/blob/main/CONTRIBUTING.md).
- [x] I've signed the [CLA](http://www.ubuntu.com/legal/contributors/).
- [x] I've successfully run `make lint && make test`.
- [x] I've added or updated any relevant documentation.
- [x] I've updated the relevant release notes.
Evaluation history
| Date | Model | Scores | Action | Summary |
|---|---|---|---|---|
| qwen/qwen3.6-35b-a3b | — | — | Merged hotfix/8.14 into feature/ubuntu-kernel-plugin to bypass unstable Snapcraft 9 changes on main. Approved by two reviewers and passed CI checks despite one failing store test. 52 files changed. | |
| qwen3.6-35b-a3b-mtp-q6 | — | — | Merged hotfix/8.14 into feature/ubuntu-kernel-plugin to avoid unready Snapcraft 9 changes in main. Completed by maintainer mr-cal. | |
| qwen3.6-35b-a3b-mtp-q6 | — | — | Merged hotfix/8.14 into feature/ubuntu-kernel-plugin to avoid unready Snapcraft 9 changes in main. Successfully completed by maintainer mr-cal. |
Update history
No update history recorded yet.
Related issues
| Issue | Project | State | Summary | Similarity |
|---|---|---|---|---|
| #6040 chore(merge): hotfix/8.14 into feature/kernel-initrd-plugin | snapcraft | merged | Merged hotfix/8.14 into feature/kernel-initrd-plugin to avoid unready Snapcraft 9 changes in main. Approved by two reviewers with passing CI checks. The branch was successfully integrated across 111 files. | |
| #6028 chore(merge): hotfix/8.14 into main | snapcraft | merged | Merged hotfix/8.14 into main to bring CI fixes to the primary branch. Approved by two reviewers and passed CI checks. Updated 25 files with 268 additions and 76 deletions. | |
| #5992 chore(merge): merge/8.13 into hotfix/8.14 | snapcraft | merged | Merged hotfix/8.13 into hotfix/8.14 to include three previously overlooked commits. Approved by two reviewers and passed CI checks before integration. | |
| #5669 chore(merge): hotfix/8.10 into main | snapcraft | merged | Merged hotfix/8.10 into main to prepare for the 8.11 release. Approved by two reviewers and passed CI checks, with one unrelated spread test failure acknowledged and dismissed. | |
| #4949 chore: cherry-pick fixes to hotfix/8.3 | snapcraft | merged | Merged cherry-pick of two hotfixes and two test updates from main to hotfix/8.3. Approved by two reviewers with passing CI. Prepares the Snapcraft 8.3.2 release following the 8.4 delay and resolves failing CI checks. | |
| #5747 chore(merge): hotfix/8.11 into main | snapcraft | merged | Merged hotfix/8.11 into main to prepare for the 8.12 release. Approved by two reviewers and passed CI checks. | |
| #5745 chore(merge): hotfix/8.11 into main | snapcraft | closed | Merged hotfix/8.11 into main. All CI checks passed successfully. The pull request was closed after integration without reviewer comments or test failures. | |
| #924 chore(merge): hotfix/2.1 into main | craft-parts | closed | Merged and closed. The maintainer integrated hotfix/2.1 into main, updating 10 files with 50 additions and 16 deletions. No review comments or CI checks were recorded. | |
| #4574 chore: merge 8.0.3 hotfix into main | snapcraft | merged | Merged the 8.0.3 hotfix into main. Approved by two reviewers, passed CI checks, and maintained stable code coverage at 88.33%. The commit touched 11 files with 214 additions and 26 deletions. | |
| #1177 chore(merge): hotfix/7.2 into main | craft-application | merged | Merged hotfix/7.2 into main after two reviewers approved. The pull request only updates the changelog since all fixes were already cherry-picked. CI passed and the branch was successfully integrated. |