← Back to issue list

chore(merge): merge/8.13 into hotfix/8.14

View original Github issue

Metadata

Project
snapcraft
Number
#5992
Type
pull request
State
merged
Author
mr-cal
Labels
PR: Merge
Created
Updated
Closed

Current evaluation

Merged hotfix/8.13 into hotfix/8.14 to include three previously overlooked commits. Approved by two reviewers and passed CI checks before integration.

Suggested action:

No scores available.

Issue body

There were 3 commits on `hotfix/8.13` that hadn't been part of a tagged released. I overlooked these when creating `hotfix/8.14`. --- - [x] I've followed the [contribution guidelines](https://github.com/canonical/snapcraft/blob/main/CONTRIBUTING.md). - [x] I've signed the [CLA](http://www.ubuntu.com/legal/contributors/). - [ ] I've successfully run `make lint && make test`. - [ ] I've added or updated any relevant documentation. - [ ] I've updated the relevant release notes.

Evaluation history

Date Model Scores Action Summary
qwen/qwen3.6-35b-a3b Merged hotfix/8.13 into hotfix/8.14 to include three previously overlooked commits. Approved by two reviewers and passed CI checks before integration.
qwen3.6-35b-a3b-mtp-q6 Merged three unreleased commits from hotfix/8.13 into hotfix/8.14 to backport missing changes. The maintainer successfully merged the pull request to align the hotfix branch with prior updates.
qwen3.6-35b-a3b-mtp-q6 Merged hotfix/8.13 into hotfix/8.14 to backport three untagged commits overlooked during the initial branch creation. The maintainer completed the merge to ensure all fixes were included in the release branch.

Update history

No update history recorded yet.

Related issues

Issue Project State Summary Similarity
#5990 chore(merge): merge/8.12 into hotfix/8.14 snapcraft merged Merged hotfix/8.12 into hotfix/8.14 to incorporate the 8.12.1 tag and release notes. No code changes were introduced. Approved by two reviewers and passed all required CI checks before merging.
93%
#6028 chore(merge): hotfix/8.14 into main snapcraft merged Merged hotfix/8.14 into main to bring CI fixes to the primary branch. Approved by two reviewers and passed CI checks. Updated 25 files with 268 additions and 76 deletions.
91%
#5747 chore(merge): hotfix/8.11 into main snapcraft merged Merged hotfix/8.11 into main to prepare for the 8.12 release. Approved by two reviewers and passed CI checks.
90%
#5889 chore(merge): 8.13 into main snapcraft merged Merged hotfix branch 8.13 into main. The commit reverts a prior revert, resolves release notes and uv.lock conflicts, and concludes the 8.13 hotfix cycle. Approved with passing CI checks.
89%
#5044 chore(merge): work/merge-8.3-8.4 into main snapcraft merged Merged hotfix/8.3 and hotfix/8.4 into main. Approved by two reviewers and passed CI. Force-pushed once to sync with main before final integration.
89%
#5669 chore(merge): hotfix/8.10 into main snapcraft merged Merged hotfix/8.10 into main to prepare for the 8.11 release. Approved by two reviewers and passed CI checks, with one unrelated spread test failure acknowledged and dismissed.
88%
#4574 chore: merge 8.0.3 hotfix into main snapcraft merged Merged the 8.0.3 hotfix into main. Approved by two reviewers, passed CI checks, and maintained stable code coverage at 88.33%. The commit touched 11 files with 214 additions and 26 deletions.
88%
#4824 chore: merge 8.2.9 hotfixes snapcraft merged Merged after approval from two reviewers. Integrates 8.2.9 hotfixes across six files. A reviewer noted unrelated CI failures due to network issues, but the changes were successfully merged.
88%
#5745 chore(merge): hotfix/8.11 into main snapcraft closed Merged hotfix/8.11 into main. All CI checks passed successfully. The pull request was closed after integration without reviewer comments or test failures.
88%
#5026 chore(merge): 8.3.3 into main snapcraft merged Merged version 8.3.3 into main. Added changelog notes for the hotfix release as main lacked them. No code changes were needed since dependencies were already updated. Approved by two reviewers and passed CI.
88%